Milestones

  • Main LCWIP Engagement and Consultation

    July 2022

     

    -

     

    December 2023

    During 2022, the council started updating its promoted cycle route blueprints for Ampthill and Flitwick, Biggleswade, Potton and Sandy, Dunstable and Houghton Regis, Arlesey, Henlow, Fairfield and Stotfold and Leighton Linslade. The update has been triggered by the introduction of much higher standard for the provision of pedestrian and cycle infrastructure. The aim is to move quickly to an environment where most local trips are cycled or walked.

    The route map for the locations above have now been adopted and we'd like your comments on whether the rural routes we are suggesting are the right ones, or if not, what needs to change and why.

    With your help and input, we can connect our smaller towns and villages with the larger conurbations. Making it possible to travel actively throughout Central Bedfordshire.

    Below is a link to the adopted LCWIPS, as these have already been consulted on and adopted, we will not be taking any comments on these areas.

    Click here to view adopted Local Cycling & Walking Infrastructure Plans

  • Community Engagement

    12th August 2024

     

    -

     

    23rd September 2024

    Gathering views from the community to help shape the route/improvements and inform the final network.
  • Plan Development & Adoption

    October 2024

     

    -

     

    March 2025

    Develop and adopt all of the Local Cycling and Walking Infrastructure Plans for Central Bedfordshire. These will be done together following engagement with the community.
  • Scheme Design

    January 2025

     

    -

     

    March 2030

    Using the final network and all identified improvements to develop schemes which can be implemented to improve local infrastructure. Each scheme will be designed, costed and prioritised.
  • Network Upgrades

    January 2025

     

    -

     

    March 2030

    Each plan will give us a list of improvements that need to be made. These will then be rolled out across the decade.